A scope of work
in Microsoft Word.

An editable .docx scope of work with deliverables and milestone tables, and how to work on it in Word with your client.

Free download. No email required.

Last updated

SCOPE OF WORKTemplate preview · Example
01

Deliverables

Sitemap and wireframes; Designs for the homepage and inner-page templates.

02

Out of scope

Copywriting and photography; Domain, hosting and third-party subscriptions.

03

Client responsibilities

Final copy and images for every page.

04

Milestones

Discovery → Design → Build → Testing and launch.

Writing a scope of work in Word

A scope of work goes through rounds of review before it’s signed, so it suits Word: tables keep deliverables and milestones tidy, Track Changes shows what each side changed, and the final version exports cleanly to PDF. Section-by-section guidance is on the scope of work template page.

Step by step in Word

  1. Download the Word (.docx) file and open it.
  2. Fill in the project details and objectives, replacing every placeholder in brackets.
  3. Complete the Deliverables table: one row per deliverable, with format and due date. Press Tab in the last cell to add a row.
  4. Write the Out of scope and client responsibilities lists; these prevent most disputes.
  5. Fill in the Milestones table and link each date to the input or approval it depends on.
  6. Turn on Review → Track Changes and send it to the client for review.
  7. Agree changes, accept them, then export a clean PDF for signature.

Word tips for scopes of work

  • Repeat table headers on long tables: select the header row, then Table Layout → Repeat Header Rows.
  • Add a table of contents for long scopes (References → Table of Contents); it uses the template’s heading styles.
  • Save it as a .dotx template once you’ve tailored it to your services.
  • Use comments for open questions rather than placeholder text, so nothing unresolved slips into the signed version.

The template

Project details

  • Project: [Name]
  • Client: [Company]
  • Provider: [Your business]
  • Reference: [SOW-001]
  • Governing agreement: [Master service agreement dated … / terms attached]

1. Background and objectives

[Why the project exists and what success looks like.]

2. Scope of work

  1. Discovery: [activities]
  2. Design: [activities]
  3. Build: [activities]
  4. Testing and launch: [activities]

3. Deliverables

#DeliverableDescription / formatDue
1[Sitemap and wireframes][Detail][Date]
2[Designs for the homepage and inner-page templates][Detail][Date]
3[Built, tested website on the client’s hosting][Detail][Date]
4[Editor training and a short how-to guide][Detail][Date]

4. Out of scope

  • [Copywriting and photography]
  • [Domain, hosting and third-party subscriptions]
  • [SEO beyond page titles and descriptions]
  • [Ongoing maintenance after launch]

5. Assumptions and client responsibilities

  • [Final copy and images for every page]
  • [Access to the domain, hosting and booking system by invitation]
  • [One approver for each design stage]

If these are late, dependent dates move by the same amount of time.

6. Milestones

MilestoneTarget dateDepends on
Discovery[Date][Approval or input]
Design[Date][Approval or input]
Build[Date][Approval or input]
Testing and launch[Date][Approval or input]

7. Acceptance

The client’s named approver reviews each deliverable within [5] working days. Deliverables are accepted on written approval, or when the review period passes without material issues being raised.

8. Changes

Changes to scope, deliverables or timeline are agreed in writing, with the effect on fees and dates, before work begins.

9. Fees and payment

  • Fee: [Amount and basis]
  • Schedule: [Payment by milestone]
  • Expenses: [At cost with approval / included]

10. Sign-off

  • Client: [Name, title, signature, date]
  • Provider: [Name, title, signature, date]

Example: Brightpath Web scope of work for Northfield Physio

Key sections for a five-page website with online booking. Both companies are fictional.

Deliverables

#DeliverablePhase
1Sitemap and wireframesDiscovery
2Designs for the homepage and inner-page templatesDesign
3Built, tested website on the client’s hostingBuild
4Editor training and a short how-to guideTesting and launch

Out of scope

  • Copywriting and photography
  • Domain, hosting and third-party subscriptions
  • SEO beyond page titles and descriptions
  • Ongoing maintenance after launch

Client responsibilities

  • Final copy and images for every page
  • Access to the domain, hosting and booking system by invitation
  • One approver for each design stage

Fees

  • Total: $7,150.00 excluding tax
  • Schedule: Invoiced at the end of each phase: Discovery, Design, Build, Testing and launch

Content and launch dates

Launch dates assume the client supplies final content by the agreed date. If content is late, the launch date moves by the same amount of time.

MAKE IT WORK FOR YOU

Useful structure.
Your way of working.

01

Tables for deliverables.

One row per deliverable, with format and date, makes acceptance easy to check later.

02

Review with tracked changes.

The client sees exactly what you changed between drafts, and so do you.

03

Sign the PDF.

Export the agreed version to PDF so the signed scope can’t drift.

GOOD QUESTIONS

Before you download.

Talk to us
Can I use this scope of work in Google Docs?

Yes. Upload the .docx to Google Drive and open it with Google Docs. Use Suggesting mode for tracked edits.

How do I add rows to the deliverables table in Word?

Click in the last cell of the table and press Tab, or right-click a row and choose Insert → Insert Rows Below.

What’s the difference between a scope of work and a statement of work?

A scope of work describes the work and deliverables; a statement of work adds the timeline, fees, acceptance and sign-off around it.

Is the template free?

Yes. Download it without an account or email address.

THE CLIENT EXPERIENCE, IN ORDER

Good habits. A shared home.

Bring the work you share with clients into one place.